SAP PLANT A -B- C (03-2012/01-2013 )
Carried out repairment works of Waste Heat Boiler , Economizer ,SuperHeater ,FeedWater Tank, Erected new Drain Lines & PreSuperHeatrer Vent Lines.
SAP PLANT A -B- C (03-2012/01-2013 )
Carried out repairment works of Waste Heat Boiler , Economizer ,SuperHeater ,FeedWater Tank, Erected new Drain Lines & PreSuperHeatrer Vent Lines.